Vickie L. Ammons 10196 48th St Clear Lake, Minnesota Cell: 614-354-9389 Email: Warmirish62@yahoo.com SUMMARY I have over 29 years’ experience in
Administration and Project Controls in construction and operational
maintenance of electric generating facilities with direct involvement in
Engineering, Procurement, Construction, Project Control, and Inventory
Control. I have over thirteen years experience in scheduling at nuclear
power plants, combined cycle plants, IT work and coal fired plants. I
have created schedules and maintained both hourly and daily schedules.
I have worked with schedules having anywhere from 800 activities to over
50,000 activities. I have excellent Computer, analytical, technical,
communication and organizational skills. I have held positions with
commensurate responsibilities in Project Controls, Resource Management, Records
and Document Control Support. WORK HISTORY Feb 2014 – Present: Scheduling SUN Technical Services – Xcel Energy Senior Scheduler – Created and
maintained Schedules for the Fukushima FLEX Modifications, MET tower
Replacement, Obsolete Equipment Replacement, EDG Tornado Missile Protection
along with many other projects at Xcel Energy’s Monticello plant.
Coordinated schedule work with Online and Outage schedulers and plant Work
Week Managers. Resource loaded schedules in order to produce histograms.
Created Critical path reports, milestone tracking and look ahead
schedules. Worked many fast track projects also. Scheduling was done
using Primavera Project Management P6 R8.3.2 Software. May 2013 – Oct 2013: Scheduling Pegasus Organization – Duke Energy Senior Scheduler – Created and
updated the construction schedule for a substation bank installation and bank
demolitions. Created Dukes 10 year transmissions addition plan for 103
future line and substation projects in the state of Florida. Schedules
were cost and resource loaded. Interacted with contractors and Duke
Energy management for updates and schedule input. Scheduling is done
using Primavera Project Management P6.7 Software. Nov 2012 to Feb 2013: Scheduling Bechtel - Florida Power & Light, Turkey
Point Senior Scheduler – Supported EPU
scheduling efforts for the Turkey Point Extended Power Uprate (EPU) Project,
including Online, and Outage activities. Led daily EPU update meetings.
Interfaced with Construction Supervision, Project Management, Field
Engineering, Subcontracts, Management, Oversite and other Station support
groups. Resource loaded schedules. Produced histograms, critical
path reports and look ahead schedules. Scheduling is done using
Primavera Project Management P6.7 Software. Sept 2011 to Nov 2012: Planning /
Scheduling Black Diamond Services – Florida Power
& Light, Saint Lucie Power Plant Senior Scheduler – Supported EPU
scheduling efforts for the PSL Extended Power Uprate (EPU) Project, including
Pre-outage, Online, and Outage activities. Was the EPU Outage Team Room
Scheduler for SL1-24 / SL2-20 Outages. Led weekly EPU Pre-outage update
meetings along with horizontal and vertical slice review meetings for
individual mods. Interfaced with Construction Supervision, Project
Management, Field Engineering, Subcontracts, FPL Management, Oversite and
other PSL Station support groups. Scheduling is done using Primavera
Project Management P6.7 Software. Feb 2010 to Sept 2011: Scheduling Tech USA – Shaw Group Senior Scheduler - Responsibilities
include creating, maintaining and the integration of Procurement for Site
Specific and Standard Plant Schedules. Was also responsible for
critical path analysis. Interfaced with Engineering, Construction Group, Site
Specific and Subcontracts scheduling teams to ensure all inter-project ties
are made and validated. Produced milestone reports and progress reports
using Primavera Project Management P6.7 Software. Led bi-weekly
meetings with Construction Management Team, Engineering and the Client to
obtain progress updates and provide schedule reports. Nov 2008 to Nov 2009: Planning /
Scheduling IMC – Bechtel Planner/Scheduler – Responsible for
creating and maintaining the level 3 and level 5 resource loaded schedules
for the construction of the balance of plant (AQCS) work for a coal fired
power plant. Ran the weekly update meeting for the balance of
plant. Interacted daily with the superintendents and field engineers in
order to get the appropriate updates. Also interacted heavily with
procurement tracking the delivery of materials. Provided support for
the project reforecast. Prepared storyboards to coordinate construction
of the AQCS area. Compiled the management construction weekly progress
report. Prepared and maintained the fall outage schedule. March 2007 to Nov 2008: Scheduling Granite International – General Electric Scheduler – Responsible for
creating level 2 and level 3 procurement schedule. Loaded resources and
man-hours into the schedule. Sent weekly updated schedules for owner
review and two week look-ahead’s. Attended daily logic review
meetings. Created man-hour and predecessor-successor reports as needed for
Process Owners. Created fragnets to integrate into the system
schedules. Helped maintain and update the engineering schedule.
Helped maintain the COLA and DCD schedule also. Schedule development
and maintenance is accomplished with Primavera P3. Nov 2006 to March 2007: Scheduling Footbridge Staffing – Shaw Group
Corporate Scheduler – Responsible for
the creation of an EPC schedule for the installment of SCR’s and FGD’s at a
fossil fuel plant. Met with engineers to develop their system schedules.
Created various reports and layouts for engineers use. Updated engineering
activities. Created fragnets to integrate into the system schedules.
Developed level 2 activities into level three activities. Attended
schedule update meetings.
Schedule
development and maintenance is accomplished with Primavera P3. May 2004 to Nov 2006: Scheduling SUN Technical Services – Brown’s Ferry
Nuclear Plant Scheduler – Responsible for
tracking material for all Maintenance and Modification work
orders. Worked in close contact with the expediters to ensure
that material will meet the dates of scheduled work activities. If the
ETA of material does not meet the date for scheduled activities I analyzed
the impact this would have on the scheduled work and the schedule
milestones. Worked directly with the expediters and the field so as to
achieve as little impact as possible. Was also the representative for
materials scheduling in the system turnover meetings, vessel fill and gate
pull, tracking all material needed to meet these milestones. Was
designated to be a member of the High Impact Team, representing
materials. The goal of the team was to evaluate the procurement process
and to try and improve upon it in all possible ways. Schedule
development and maintenance was accomplished with Primavera P3. November 2003 to May 2004: Scheduling Science Applications International
Corporation
– Midwest ISO Scheduler – Responsible for distributing
update templates, receiving updates and incorporating the updates in the
schedule. Created weekly reports on schedule progress/slippage, “S”
curves, look aheads for management meetings and resource loading the
schedule, which consisted of approximately 3500 activities for MISO’s Reliability
Enhancement and Market Implementation. Schedule development and
maintenance is accomplished with Microsoft Project 2000. June 2002 to August 2003: Scheduling Kamtech, Inc. – Possum Point 6,
Dominion Power Scheduler – Responsible for interfacing with
project manager and project supervisors to ensure proper updating and
maintenance of the EPC schedule. Provided the project manager with
feedback as to project status and critical path. This schedule was for
the Procurement, Contracts, Mechanical, Electrical, Piping and
Civil/Structural areas for this project. Was responsible for the
creation of proposal schedules for several future jobs. Created and
maintained the schedules for the SCR outage, chemical cleaning and hydro of
both units. Assisted in the expeditious completion of the construction
turnover packages for this project. The schedule that was created is
for a two unit, combined cycle plant. Schedule development and
maintenance is accomplished using P3. January 2001 to March 2002: Scheduling SUN Technical Services – American Electric Power, Corporate
Scheduler – Responsible for working with
project managers and multiple contract companies to create and maintain a
project schedule for construction of a combined cycle plant.
Responsible for ensuring proper schedule updates, providing feedback to
project managers on daily progress and earned value. Was on a team of
schedulers responsible for the creation of the Engineering and Construction
schedule for a large combined cycle project in New York. Was also
responsible for maintaining the Engineering schedule for a large combined
cycle project located in Louisiana. Schedule development is
accomplished using Primavera P3. October 2000 to December 2000: Scheduling Sun Technical Services - D.C. Cook Power
Plant Senior Construction Scheduler - Responsible for
providing scheduling and project control expertise to management and
construction leads during Unit 1 recovery. Responsibilities included
reporting daily status from construction and providing feedback to management
on daily progress. Scheduling specific design changes, ensuring proper
logic ties and schedule development. Schedule development is
accomplished using Primavera P3. January 2000 to September 2000: Planning and
Scheduling PM Solutions, Havertown, PA Consultant for State Farm Insurance - Responsible for
facilitating Project Charter, Project Plan and Project Schedule
meetings. Work directly with project managers and project team to
create, status and maintain the project schedule. Assist project
managers with resource, time allocations and monitoring of task status.
Proficient in Microsoft Project 98 and Planview 5.0. October 1998 to January 2000: Plant
Restart Project Illinois Power Co. - Clinton Nuclear
Plant Project Control Specialist – Created and
maintained schedules for several project managers responsible for the
degraded voltage project. Provided the project managers with schedule
progress, critical path and earned value. Responsible for control and
tracking of Detail Impact Assessment items utilized in the work scope and
performance factors associated with Engineering Change Notices for major
plant modifications and installations. Provided organization with
assigned project work and monitoring of task completion for project
closure. Assisted Project Manager in providing graphs and management
level reports for tracking project tasks, resources and costs.
Proficient in Windows 95/98 applications, Microsoft Word, Excel, Access,
Mainframe Work Management Systems and Primavera P3. February 1998 to October 1998: Retail
Analysis Daily Grind Coffee Co., Decatur, IL Customer Representative - Provided
project sales and customer support, ensuring customer satisfaction is aligned
and supportive of assigned responsibilities. August 1997 to May 1998: Pursuant of educational advancement as a
full-time student. October 1996 to January 1997: - Plant Restart
Project Illinois Power Co. - Clinton Nuclear
Plant Project Control Administrator - Responsible for
administration and performance reporting of invoice and payroll for over five
hundred human resource personnel. Provided resource estimating
utilizing Microsoft Excel and Bechtel Engineering Payroll System Software. June 1985 to March 1996: Commercial
Power Operations Illinois Power Co. - Clinton Nuclear
Plant Project Control Administrator: Operations Department: Responsible
for weekly payroll input and estimating of human resource requirements.
Provided Scheduling and call-outs for 90 - 100 individuals. Provided
tracking and monitoring of operational activities associated with departmental
schedules and responsibilities. Document Control: Responsible for
organization and control of all plant procedures in both receiving and
distribution. Also assigned to Process Control Distribution for
verifying and issuance of approved copies of Engineering documents and
procedures. Nuclear Planning and Support:
Responsible for acceptance and preparation of Engineering and Safety Related
documents for life of plant storage, maintaining and retrieval of all vaulted
documentation. Provided training to personnel for mainframe computer
use. EDUCATION 1999 - Primavera Scheduling and Cost &
Resource Analysis. 1997/98 - Richland Community College,
Decatur, IL. 1980/81 - Lincoln Christian College,
Lincoln, IL. 1980 – Graduate of Maroa-Forsyth High School,
Maroa, IL.